The objective of power system planning is to meet energy demand reliably and at minimum cost. Future electricity demand should be determined by incorporating demand-side management measures, such as peak-clipping, valley-filling and load-shifting, as well as efficient end-use. It is recommended that life-cycle-cost investment planning be developed and implemented to give equitable treatment to rehabilitation, loss-reduction and end-use efficiency.